06.08. Work, work skatepark build
Today we have already come a long way!
All elements are. Now we must only pay the fine work and then we're done!
Safety is in RU written, we always have a guard at the entrance and as of yesterday two cameras are installed on the roof and directed to the park.
There it was again very warm today and we're not getting more out of sweating, we have laid down a 13 clock work and drove to the Irtitsch for swimming. The water transparency is hardly 15 cm, but it refreshes something. The flow should be dangerous, more than 15 m can not swim out. The river is about 500 m wide. In winter, completely frozen and used as a highway.
After bathing drove us our driver, who wanted to offer us in the hand well and Dolls, to the best cafe in town. All the coffee drinkers among us were delighted because the other choice of coffee is rather poor.
After this trip we went to 22 clock ahead on the construction site.
0 comments:
Post a Comment